BISHKEK, Kyrgyzstan, February 6. The entire
lively capability of Kyrgyzstan’s Bishkek thermal energy plant is 308
MW, Nurlan Kuljigachev, the chief engineer of the Bishkek TPP stated,
Pattern reviews.
In line with the Kyrgyz Ministry of Vitality, 9 boiler models and 4
turbine turbines are at the moment operational, boiling water to
temperatures starting from 61 to 70 levels Celsius.
He additionally acknowledged that makes an attempt to deal with the repercussions are
ongoing.
On February 2, 2024, at round 03:00 AM (GMT+6), an explosion
occurred on the Bishkek TPP. In consequence, 5 employees with varied
accidents have been taken to medical services, and heating to
residential and business buildings in Bishkek was briefly
disrupted.